Put two or three bids on the same lines before you sign.

A lower total is not the cheaper job until every bid is describing the same work. This is the comparison the Remodel Budget & Schedule Kit is built for. It is not a verdict on your contractor.

Same scope, then the exclusions

Ask each bidder for the same rooms, the same finishes, and the same list of what is not included. Then read the exclusions. If one bid leaves out permits, disposal, or patching, write that cost back onto that bid before you compare totals. Otherwise you are comparing a full job with a partial one.

The kit's Quote Leveler is the sheet for that: up to three bids on the same lines, with exclusions added back. You type your real quotes. The example numbers in the file are illustrative only. This page does not add a local price.

What to do with the difference

When the lines match, the gap is a real gap. Ask the higher bidder what you are paying for, and ask the lower bidder what is missing. Sign after that conversation, not before. If you want a second set of eyes on the paperwork, that is Before the Remodel: a written brief on up to three quotes for the same scope. No site visit.

Source: the Quote Leveler on the Remodel Budget & Schedule Kit. This is our own method, not a national average.

Remodel Budget & Schedule KitBefore the Remodel

Questions

How many bids do I need?

Two or three, for the same scope. More bids do not help if each one describes a different job.

Is the lowest bid the best price?

Not yet. Add back what that bid excludes. A lower total that leaves out permits, haul-away, or a finish can cost more once those lines are real.

Does this page review my bids?

No. It explains the comparison. Before the Remodel is the written brief on up to three quotes for the same scope. The kit is the spreadsheet you fill with your own numbers.