Guide

Before you sign a flood-repair quote, read what the paper actually covers.

A flooded house is still a job with a quote. This page is a short list of what to look for on that quote. It is not a news story, and it does not name a price.

Two jobs, written apart

Drying and tear-out are not the same job as rebuilding the room. Ask the quote to say which one it is. A page that only shows a total does not tell you whether haul-away, drywall, flooring, or the equipment is included.

FEMA's sheet on hiring a contractor for home repair says to get two or three written estimates, and to read each one for the work, the materials, the payment timetable, and the expected timeline, not only the bottom line. Put those quotes on the same lines before you pick one. That is what the kit's Quote Leveler is for.

Source: FEMA, Tips for Hiring a Contractor for Home Repair.

The permit and the license

The 2021 International Residential Code, section R105.1, says the owner or the owner's agent shall obtain the required permit before regulated construction, alteration, or electrical, gas, mechanical, or plumbing work. Your city decides which flood repairs need one. Ask the quote who pulls it, and whether the fee is inside the number.

FEMA also says to check that the contractor is licensed and insured, with your state, not from a business card alone. In Florida, the lookup is the Department of Business and Professional Regulation. This site does not run that check for you.

Sources: 2021 IRC R105.1 · Florida DBPR license lookup.

The first payment, in Florida

Florida Statutes section 489.126 is about residential repair, restoration, improvement, or construction. If a contractor receives an initial payment of more than 10 percent of the contract price, the statute says they must apply for the necessary permits within 30 days, and start the work within 90 days after those permits are issued, unless you agreed in writing to more time or there is just cause. It does not say 10 percent is the most they may ask. Read the payment schedule in the quote, and ask what each payment is for.

Source: Florida Statutes § 489.126. This page is not legal advice.

The same gaps show up on ordinary remodel quotes: permits, haul-away, and patching left off the page. The free checklist names those lines. The Before the Remodel brief is a reading of up to three quotes for the same scope, before you sign.

Remodel Budget & Schedule KitBefore the Remodel

Questions

Is this about my insurance claim?

No. This page is about the contractor's quote. It does not say what an insurer will pay, and it does not file anything for you.

Does someone come to the house?

No. Before the Remodel is a reading of the quotes you were handed. There is no site visit.

Is 10 percent the most a Florida contractor can ask up front?

No. Florida Statutes section 489.126 does not set a maximum deposit. If the first payment is more than 10 percent of the price for residential repair, the statute starts a permit deadline and a start-work deadline. That is not legal advice, and it is not a rule for every state.

More guides: costs a quote leaves out · compare bids · kitchen timeline · flood-repair quote · Texas notes